Drain-laying on Beach Road


Recommended Posts

On 5/20/2020 at 2:31 PM, Bullfrog said:

A blinding layer maybe ..???

Had to look that up. I believe you are correct.

In construction, blinding is a base layer of weak concrete or sand that is laid above a layer of hardcore to provide a clean, level and dry working surface. A thin layer, usually around 50 mm (2 inches) thick, of blinding is poured over the hardcore, sealing in the underlying material and levelling off the surface.

  • Thanks 1
Link to post
Share on other sites
  • Replies 78
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

Update on the Beach Rd drainage project. Concrete drain forms in place and ready for use on the north end. Breaking up the existing pavement is now up to Soi 2. And digging commences a

The south end of Beach Road, from Baywalk to Walking street, is a mess at the moment. It appears that the road is being dug up to instal drains. However, if yo

Beach Rd photo update, starting from the north end. Never noticed any customers before today at the Thai Airways office. Line out the door keeping a proper social distance, probably looking to

Posted Images

1 hour ago, forcebwithu said:

Had to look that up. I believe you are correct.

In construction, blinding is a base layer of weak concrete or sand that is laid above a layer of hardcore to provide a clean, level and dry working surface. A thin layer, usually around 50 mm (2 inches) thick, of blinding is poured over the hardcore, sealing in the underlying material and levelling off the surface.

I have never been involved in kerb work before, just several thousand telecomms towers worldwide so was just guessing really ......

Link to post
Share on other sites

Today's photo update of the Beach Rd drainage project.
49922265802_cbc50c3e7b_b.jpg

49921961116_7fa504e2f1_b.jpg

49921961101_5001ce41a9_b.jpg

Hard to see in this pic, but the catch basin is still almost 3/4 full of water, so they've not yet cleaned it out. I would have thought it would be easier to clean the muck out before they completed the concrete enclosure.
49921445853_3807d332cc_b.jpg

49921961066_733198ed0a_b.jpg

49921445813_13338e549b_b.jpg

49921445783_3928bfed5d_b.jpg

First time I've seen them make an effort to sort the paving stones by color.
49921445738_5c5b5cda0e_b.jpg

Looks good when they match to the existing pavers.
49921960916_e81477ef56_b.jpg

Not so good when they don't.
49921445703_e15638c780_b.jpg

Wonder what numbnut thought it was a good idea to spray paint a marker on the pavers.
49922265912_b9ee9335dd_b.jpg

49921961261_54915a201f_b.jpg

49921445978_74a88f3c4f_b.jpg

49922265867_9e422f17f4_b.jpg

49921961171_74a65b42e5_b.jpg

  • Like 1
  • Upvote 1
Link to post
Share on other sites

The drainage project and beach pics after the early morning storms.
49947385651_fe6a932c94_b.jpg

Surprised they still haven't cleaned out the sand from the north end catch basin. The longer they wait, the more the sand will get washed farther into the drains and the harder it will be to clean it out.
49946883168_f32a4e2962_b.jpg

Beach is still in good shape.
49946883123_1812e3fdb4_b.jpg

49947671762_dfeed9ea52_b.jpg

49947386106_d67496c093_b.jpg

49946883053_1b1b4768ff_b.jpg

The usual spots prone to flooding and beach washouts look none the worse after this morning's storms. Probably more to do with lack of heavy rain than the new drains doing their job.
49946883013_af72ddca18_b.jpg

49947386001_2da09cac1b_b.jpg

49946882943_4c272e45f4_b.jpg

49947385986_f4baa6c912_b.jpg

49947671572_5303e2733f_b.jpg

49947385906_897c878abd_b.jpg

The new structure at the south end is for drainage diversion gates.
49947671307_ca0dd8acc3_b.jpg

49946882808_2e306f2693_b.jpg

49947671412_52052f826c_b.jpg

49947385776_1d41256b02_b.jpg

49947385746_7186fa4afe_b.jpg

49947385716_f21b293eee_b.jpg

Further proof this morning's rainfall wasn't much as only one of the three overflow pipes was discharging effluent.
49947385736_6943c27b3a_b.jpg

A peek inside the pumping station. Not sure what function this machinery serves.
49946882588_5bf6897c4e_b.jpg

  • Like 1
  • Upvote 2
Link to post
Share on other sites

Beach Rd drain update from this morning. North end they're now working on the opposite side of the road, tying the existing drains to the new drain.
49966219247_e7f2aff57c_b.jpg

North end is getting new paving stones.
49966219572_97b1ac65f5_b.jpg

Good to see the beach open again. Farther south noticed mostly Thais enjoying the beach.
49966219522_eeda936a9d_b.jpg

Beach chairs practicing social distancing.
49966219472_2f87386410_b.jpg

49966219452_852f00bfef_b.jpg

49965941891_f41d0d9a33_b.jpg

49965941816_cfcd47a280_b.jpg

49965438293_08de89a1e0_b.jpg

49965941756_035fd1e6be_b.jpg

  • Upvote 1
Link to post
Share on other sites
  • 4 weeks later...

?u-tube video show show dolphin to

klang. did not see any drain work and looked like pavers were back in place.

Have they actually finish all but south tie in?

Link to post
Share on other sites
2 hours ago, aj said:

?u-tube video show show dolphin to

klang. did not see any drain work and looked like pavers were back in place.

Have they actually finish all but south tie in?

Yes, the project is pretty much finished. I'll get out maybe tomorrow and snap some pics of the finished project.

Link to post
Share on other sites

If it rained in town like it did at my place last night it got a good testing.

Link to post
Share on other sites
3 hours ago, forcebwithu said:

Well it didn't take them long to dig up the newly repaired footpath. :doh:
P7020006.jpg

P7020008.jpg

Looks like they are working on burying a cable.... probably an afterthought!!!

Edited by TheFiend
  • Haha 1
Link to post
Share on other sites
1 hour ago, TheFiend said:

Looks like they are working on burying a cable.... probably an afterthought!!!

Since they're only doing this in one section, I suspect the electric to the lights in the area failed and they're running a new line. The question then becomes, why didn't they notice the lights were out and run a new line before repairing the footpath.

Link to post
Share on other sites
6 hours ago, forcebwithu said:

Well it didn't take them long to dig up the newly repaired footpath. :doh:
P7020006.jpg

P7020008.jpg

That's the beauty of laying bricks/tiles on sand easy to maintain and repair when the sand shifts or rain and the sea affect them.

If they maintain them is another story.

Link to post
Share on other sites
17 hours ago, forcebwithu said:

Well it didn't take them long to dig up the newly repaired footpath

It is all about re-work here, makes me think of the R-Con corner.

Link to post
Share on other sites
On 7/2/2020 at 6:54 PM, forcebwithu said:

Since they're only doing this in one section, I suspect the electric to the lights in the area failed and they're running a new line. The question then becomes, why didn't they notice the lights were out and run a new line before repairing the footpath.

Some years ago my local council here in Oz had some renovating done to their buildings.  The pavers on the footpath outside were laid three times before the job was finally finished.  TiT can happen elsewhere :whistling:

Link to post
Share on other sites
  • 4 weeks later...

They're still working on cleaning out the muck in the drains.
50190485478_2d52de16c4_b.jpg

Also noticed they've put in curbs to block storm water runoff to the beach at the low points from Pattaya Klang north. Kind of self-defeating IMHO if the goal is clear the roads of flood waters ASAP.
50191031791_4e544ab96b_b.jpg

50191031716_9bc119ec15_b.jpg

Wonder if they'll close the swing gate once the tide comes back in.
50190485323_96842e8a67_b.jpg

50191290482_282d7c089a_b.jpg

50191031676_021267bb2e_b.jpg

  • Thanks 2
Link to post
Share on other sites
  • 1 month later...

I've just seen a video a mate posted on FB of the devastation of the beach by the rains last night. It looks like the new drainage has had very little effect.

  • Sad 1
Link to post
Share on other sites
3 hours ago, Bazle said:

I've just seen a video a mate posted on FB of the devastation of the beach by the rains last night. It looks like the new drainage has had very little effect.

Last night"s storm was very heavy. I saw a video of Soi Buakhau during the rain, it was knee deep but later reports suggested the flooding cleared quickly.

Link to post
Share on other sites
Just now, tallguy said:

Last night"s storm was very heavy. I saw a video of Soi Buakhau during the rain, it was knee deep but later reports suggested the flooding cleared quickly.

It was 12 inches here .... but when I say 12 inches it is the diameter of the wet patches on my ceiling from where the roof leaks..... Also the pump that is permanently located at the culvert outlet wouldn't start so it was a night of drinking homebrew watching the flooding get higher and higher up my steps ....

Link to post
Share on other sites
1 hour ago, Bazle said:

I've just seen a video a mate posted on FB of the devastation of the beach by the rains last night. It looks like the new drainage has had very little effect.

From what I have seen on YT the damage is exactly the same as it always is and in the same locations ... maybe I'll take a walk tomorrow...

Edited by Bullfrog
Link to post
Share on other sites
  • 2 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    No registered users viewing this page.


×
×
  • Create New...