-
Posts
4,270 -
Joined
-
Last visited
-
Days Won
4
Content Type
Profiles
Forums
Events
Everything posted by Samsonite
-
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
"United temporarily grounds 96 757s for checks; service disruption appears minimal By: Aaron Karp United Airlines temporarily grounded its fleet of 96 Boeing 757s on Tuesday for emergency checks on air data computer systems, but said the fleet was nearly back to normal by Wednesday afternoon. The carrier said 15 flights were canceled on Tuesday owing to the checks but none on Wednesday. The checks were spurred by an internal discovery that UA hadn't conducted all of the operational checks on the equipment mandated by a 2004 FAA Airworthiness Directive. The checks took about 60-90 min. per aircraft and all air data computers were found to be "fully functional," UA said, adding that the checks caused "very minimal impact on operations." The grounding was voluntary on UA's part, FAA said. Continental Airlines' 757s were not affected." http://atwonline.com/news/other-headlines/ -
"The Hunt For Red October."
-
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
"DATE:10/02/11 SOURCE:Flight International Clark: 777-300ER responsible for sparse 747-8I sales By Brendan Sobie Emirates president Tim Clark believes the success of the Boeing 777-300ER is behind the lack of success so far for the 747-8I, which has only secured 28 orders from two airline customers since its launch in 2006. "What Boeing is up against is not the A380, it is their own machine - the 777-300ER," Clark says. "The ER has proven to be one of the most popular aircraft ever produced, which is why we bought 100 of them. Even American is buying them. Not many but ,when they start flying it, they will realise how good it is." Emirates Boeing 777-300ER © BaoLou/AirTeamImages.com Clark points out that Emirates carries 420 passengers on its 777-300ERs in a two-class configuration. He believes the 747-8I will only be able to carry slightly more passengers. "Now look at the economics. We can get the ER to operate 17.5h with that kind of payload. It's cheap to operate. The engines are hugely fuel efficient," he says. "You've an amazing capability." He also thinks the 747-8I will be "a fuel-efficient machine" as it has new wings and a new propulsion system. However, Emirates has absolutely no interest in the aircraft and Clark does not see how many carriers can justify acquiring the 747-8I given the operating economics of the 777-300ER. "I hope they get it out the door because there are so many difficulties at the moment now with the manufacturing fraternity - with the 787, the 747-8, the A380 trying to get that out the door four or five years ago and then the A400M programme. So they have all been up against it," Clark says." http://www.flightglobal.com/articles/2011/...7-8i-sales.html -
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
They are working on it, plus airbus is, or will be, building some a320s in China. Just yesterday this was the subject of conversation with a Chinese friend who said quality control, or the lack thereof, will be the major issue. -
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
"Originally published February 5, 2011 at 10:00 PM | Page modified February 5, 2011 at 10:01 PM Sunday Buzz A 'prescient' warning to Boeing on 787 trouble Boeing commercial airplanes chief Jim Albaugh had some unusually candid comments about the 787's global outsourcing strategy at a recent Seattle University talk. In a late January appearance at Seattle University, Boeing Commercial Airplanes Chief Jim Albaugh talked about the lessons learned from the disastrous three years of delays on the 787 Dreamliner. One bracing lesson that Albaugh was unusually candid about: the 787's global outsourcing strategy — specifically intended to slash Boeing's costs — backfired completely. "We spent a lot more money in trying to recover than we ever would have spent if we'd tried to keep the key technologies closer to home," Albaugh told his large audience of students and faculty. Boeing was forced to compensate, support or buy out the partners it brought in to share the cost of the new jet's development, and now bears the brunt of additional costs due to the delays. Some Wall Street analysts estimate those added costs at between $12 billion and $18 billion, on top of the $5 billion Boeing originally planned to invest. Interviewed after the Seattle U. talk, Albaugh avoided directly criticizing the decisions of his predecessors. The 787 outsourcing strategy was put place in 2003 by then-Boeing Chairman Harry Stonecipher, who was ousted in 2005, and Commercial Airplanes Chief Alan Mulally, now chief executive at Ford. "It's easy to look in the rear-view mirror and see things that could have been done differently," Albaugh said. "I wasn't sitting in the room and I don't know what they were facing." And yet, at least one senior technical engineer within Boeing predicted the outcome of the extensive outsourcing strategy with remarkable foresight a decade ago. Albaugh and other senior leaders within Boeing may be belatedly paying attention to a paper presented at an internal company symposium in 2001 by John Hart-Smith, a world-renowned airplane structures engineer. Hart-Smith, who had worked for Douglas Aircraft and joined Boeing when it merged in 1997 with McDonnell Douglas, was one of the elite engineers designated within the company as Senior Technical Fellows. His paper was a biting critique of excessive outsourcing, a warning to Boeing not to go down the path that had led Douglas Aircraft to virtual obsolescence by the mid-1990s. The paper laid out the extreme risks of outsourcing core technology and predicted it would bring massive additional costs and require Boeing to buy out partners who could not perform. Albaugh said in the interview that he read the paper six or seven years ago, and conceded that it had "a lot of good points" and was "pretty prescient." In his talk at Seattle U., the first specific lesson Albaugh cited as learned from the 787 debacle seemed to echo Hart-Smith's paper. Albaugh said that part of what had led Boeing astray was the chasing of a financial measure called RONA, for Return on Net Assets. This is essentially a ratio of income to assets and one way to make that ratio bigger is to reduce your assets. The drive to reduce RONA thus spurred a push within Boeing to do less work in-house — hence reducing assets in the form of facilities and employees — and have others do the work. Hart-Smith argued that it was wrong to use that financial measure as a gauge of performance and that outsourcing would only slash profits and hollow out the company. Reached by phone in his native Australia, where at 70 he is now retired, Hart-Smith said he'd heard in recent months on the grapevine from former colleagues that senior executives at Boeing Commercial Airplanes have been reading his paper. "I'm glad they got the message," Hart-Smith said. "It took far too long." After he presented his paper at a company symposium in 2001, he received hundreds of supportive e-mails from engineers and lower-level managers, he said. But a senior executive present at the symposium spent a half-hour after his presentation attacking the paper, and afterward Boeing leadership ignored Hart-Smith. He had hoped to join the 787 program but wasn't permitted to do so. He felt sidelined, he said. In Hart-Smith's analysis, the seeds of Boeing's outsourcing ideas grew out of the McDonnell aircraft business, which focused on military-airplane programs. On the military side of the business, the U.S. government was the major, often the only, customer and it funded development costs in full. "The military approach didn't require you to risk your own money," Hart-Smith said. "That was the McDonnell Douglas mentality." He blamed that attitude for the major outsourcing on the MD-95 and proposed MD-12 programs, the failure of which led to the decline of Douglas' commercial-airplane business in California. The same ideas were transferred to Boeing with the McDonnell Douglas merger and led directly to the 787 outsourcing strategy, he said. Taken to its extreme conclusion, Hart-Smith said mockingly, the strategy of maximizing return on net assets could lead Boeing to outsource everything except a little Boeing decal to slap on the nose of the finished airplane. Though most of the profits would be outsourced to suppliers along with all the work, and all the company's expertise would wither away, the return on investment in a 25-cent decal could be 5,000 percent. Has Boeing belatedly seen the light and embraced Hart-Smith's analysis? Clearly the 787 has brought a serious rethink at the top. "We went too much with outsourcing," Albaugh said in the interview. "Now we need to bring it back to a more prudent level." That likely includes building the horizontal tails of the next version of the Dreamliner, the 787-9, in the Seattle area. And for the next all-new airplane that Boeing will build, Albaugh vows that "we can do things differently and better." "Doing the new airplane the way we did this one is not what we want to do." But the rethink may not be as radical as Hart-Smith would like. In his paper he wrote that while some selective outsourcing is necessary, Boeing should keep most of the work it has traditionally done in-house. Albaugh balked at going that far. "I haven't said keep most of the work in-house," Albaugh said. "I still believe we need to make sure we try to access the best technologies and capabilities that are available around the world." And despite what Hart-Smith has heard on the grapevine, no one from Boeing's leadership has actually called him up to talk about his analysis. Hart-Smith retired from Boeing in 2008. He still presents engineering papers at academic conferences around the world. Yet that startlingly prescient 2001 paper focused on business economics. Where did a structures engineer get that kind of expertise? "It's common sense," Hart-Smith said. — Dominic Gates" http://seattletimes.nwsource.com/html/sund...ndaybuzz06.html -
Symantec (Norton's) has improved, but it is still a dog. Within the last six months I've removed it from a system as it, as usual, dragged the system down to its knees. There is much better security software available and some of it is even free. That people pay good money to tie an anchor (Symantec) to their computer is a tribute to the power of advertising. It would be interesting to know what Peter Norton really thinks of the software Symantec has branded with his name. As to the Mac and viruses: The Mac OS is build from about three different OS, all with Unix heritage, but the bulk of it is based on Darwin. Unix by its very design is more secure than any version of ms-windows ever produced, but winblows 7 is, finally, showing some real improvements in security. However, that said, if the Mac were to become the dominate operating system, I'm sure those deviant, twisted little fuckers sitting in their mother's basement living on pizza and sugar water, would turn their attention to OSX. It would be harder for them to do, but they would give it a go. :)
-
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
"Boeing Response to Public Reports Regarding the WTO's Final Ruling in DS 353 CHICAGO, Jan. 31, 2011 /PRNewswire/ -- Boeing (NYSE: BA) today released the following statement, responding to public reports that the WTO panel deciding European Union claims of U.S. government assistance to Boeing has issued a confidential final ruling rejecting the vast majority of Europe's claims: "Today's reports confirm the interim news from last September that the WTO rejected almost all of Europe's claims against the United States, including the vast majority of its R&D claims – except for some $2.6 billion. This represents a sweeping rejection of the EU's claims. "Nothing in today's reports even begins to compare to the $20 billion in illegal subsidies that the WTO found last June that Airbus/EADS has received (comprised of $15 billion in launch aid, $2.2 billion in equity infusions, $1.7 billion in infrastructure, and roughly $1.5 billion in R&D support). "The WTO's decisions confirm that European launch aid stands alone as a massive illegal subsidy only available to Airbus, which has seriously harmed Boeing, distorted competition in the aerospace industry for decades, and resulted in the loss of tens of thousands of good-paying U.S. jobs. "Today's decision will not require any change in policy or practice, or other remedy that comes close to approaching the billions of dollars of launch aid that must be repaid by Airbus or restructured on proven commercial terms. As a result of the June WTO ruling, EU governments and Airbus/EADS must repay or restructure $4 billion in still outstanding illegal launch aid subsidies Airbus received to develop the A380. They must also remedy the adverse effects of the additional $16 billion in other illegal subsidies Airbus received. "Under the WTO's decisions, Airbus must now compete in the global marketplace without the massive illegal subsidies it has received since its inception and without which, the WTO held, Airbus would be 'a much different, and we believe a much weaker' company than it is today. It will be required to finance airplanes the same way Boeing does – with its own money. Having recently announced it has more than $13 billion dollars of cash on hand, Airbus should have no problem with this new requirement. "Today's ruling underscores our confidence in the WTO processes and dispute-resolution procedures. We applaud the body for its work and continue to look to Airbus/EADS and the EU to recognize that in today's global market, everyone must play by the rules and abide by WTO requirements. Playing by the rules, for Airbus/EADS, means withdrawing the still-outstanding A380 prohibited launch aid subsidy and financing the A350 on commercial terms. Airbus should confirm its intention to comply with the WTO's decisions." Editor's Note: More information about the WTO cases can be found at www.boeing.com/WTO." http://boeing.mediaroom.com/index.php?s=43&item=1603 -
I booted over to ms-windows and downloaded and install it and it is very impressive. It does take some getting use to as far as how to access the bookmarks, etc. However, I can't honestly say it is any faster than Opera 11.01, and, imho, Opera has a better looking interface.
-
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
Dupe. please delete. -
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
No, you are correct. My mistake. I was thinking of a different model GE90 that are installed on the newer 777 models (-300ER, -200LR and -200F). -
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
When, where, and on what aircraft did a GE90 explode? -
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
I just finished reading the latest press on the subject and it definitely looks like Boeing is leaning towards a "clean sheet" replacement for the 737, but not before 2020. It would appear their priorities, at the moment, are the 787-8, 787-9, 787-10 (a stretch of the -9), some enhancements to their already extremely successful 777-300ER and then, finally, a 737 replacement. Boeing CEO Jim McNerney gave them an out with this statement, "... think what we're learning today about what our customers need and what technologies we have available to us, we are leaning toward development in the 2020 timeframe, but we're going to confirm that as we go through it this year, reserving the option - if we're wrong - as we go through the analysis to re-engine. But I don't think it's going to go that way." -
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
No. The final decision, one way or the other, hasn't been made. "Jim McNerney, chairman and chief executive, said Boeing was "leaning" toward a 737 replacement rather than updating the plane with new engines..." -
The Truth about Aids/HIV
Samsonite replied to PattayaPete's topic in General Discussion about Pattaya
After getting divorced and realizing I would be "back out there" looking for "companionship" I read as much on this subject as I could find on the Internet and elsewhere, and pretty much came to the same conclusions. -
Turns out you are correct, which I found surprising given the U.S. government's habit of sticking their nose into every aspect of our lives. Having been told that by a well seasoned traveler shortly after 9/11, I assumed it to be a govt. regulation. Apparently it is up to the airports and/or the airlines. "How much time should I allow before my flight? SFO suggests that you check with your airline directly for its recommended arrival time. For domestic flights, most airlines suggest arriving two hours before departure. For international flights, most airlines recommend arriving three hours before departure." http://www.flysfo.com/web/page/orphan/faq/index.html#2
-
I'm sure mickeysoft would beg to differ, but according to these statistics (see link below) Firefox surpassed ms-internet exploiter as the most popular browser two years ago this month. Google Chrome is coming on strong. I just don't trust Google anymore than mickeysoft so I've been hesitant to check out Chrome. http://www.w3schools.com/browsers/browsers_stats.asp
-
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
Yep. Garuda Indonesia Airways has a very poor record. Weren't they blacklisted from the EU for awhile? -
I would guess having to be there 2 hours before departure was for the domestic leg of the flight and that counts towards the Federal regulation requiring all passengers on International flights to check in 3 hours before departure. As I always comply, I don't know if it is really enforced or not.
-
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
Qantas has had a long string of problems since they started outsourcing some of their maintenance a few years ago. It is all about the airlines trying to save money by cutting corners on repairs. Here is an interesting take of the problem: http://www.flightglobal.com/blogs/flightbl...ry-24---fr.html -
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
Qantas has had a long string of problems since they started outsourcing some of their maintenance a few years ago. It is all about the airlines trying to save money by cutting corners on repairs. Here is an interesting take of the problem: http://www.flightglobal.com/blogs/flightbl...ry-24---fr.html -
Opera.
-
Airbus and Boeing products running behind schedule
Samsonite replied to BigDUSA's topic in Idle Chit Chat
Jan. 25, 2011 Boeing, Alaska Airlines Complete Contract for 15 Next-Generation 737s. Jan. 19, 2011 Boeing, American Airlines Complete Contract for Two 777-300ERs. Jan. 4, 2011 CIT, Boeing Announce Order for 38 Next-Generation 737 Airplanes.
