Jump to content
Instructions on joining the Members Only Forum

Samsonite

Participant
  • Posts

    4,270
  • Joined

  • Last visited

  • Days Won

    4

Everything posted by Samsonite

  1. The GAO has a excellent reputation, so given what they pointed out as errors in the Air Force procedures perhaps there should be a criminal investigation into the relationship between the Air Force selection committee and Airbus/EADS?
  2. "Boeing Achieves 787 Power On EVERETT, Wash., June 20 /PRNewswire-FirstCall/ -- The Boeing Company (NYSE: BA) has completed the Power On sequence for the first 787 Dreamliner, marking the completion of the next major milestone on the path to first flight later this year. Power On is a complex series of tasks and tests that bring electrical power onto the airplane and begin to exercise the use of the electrical systems. The 787 is a more-electric airplane with the pneumatic, or bleed air, system being totally replaced by electronics. "The team has made great progress in bringing the bold innovation of the 787 to reality," said Pat Shanahan, vice president and general manager of the 787 program. "There is plenty of work to be done between now and first flight, but with every step forward we grow more and more confident." The Power On sequence began in early June with a series of pretest continuity checks to verify that the wiring installed in the airplane had been connected properly. Upon completion of those checks, the Boeing team plugged in an external power cart and slowly began to bring full power into each segment of the system, beginning with the flight deck displays. From that point forward, the pilot's controls were used to direct the addition of new systems to the power grid." http://www.flightglobal.com/blogs/flightblogger/ Purely subjective. The interiors are picked by the airline and in some cases designed by the airline. The airline picks the type of seats, the arrangement of the seats (distance apart front to back and side to side) and to a limited effect, the type and position of the kitchens and toilets. In theory, two different aircraft could have the same interior and most people wouldn't know the difference, including you.
  3. http://www.flightglobal.com/blogs/flightblogger/ "Breaking: GAO Sustains Boeing Tanker Protest This is a breaking story and will be updated as details become available. GAO Statement "We recommend that the Air Force reopen discussions with the offerors, obtain revised proposals, re-evaluate the revised proposals and make a new source selection decision, consistent with our decision." UPDATE: The GAO sustained Boeing's tanker protest on seven different criteria. Explained in English. 1. The USAF used a different ruler than the one Boeing thought they were using. The Air Force, in making the award decision, did not assess the relative merits of the proposals in accordance with the evaluation criteria identified in the solicitation, which provided for a relative order of importance for the various technical requirements. The agency also did not take into account the fact that Boeing offered to satisfy more non-mandatory technical "requirements" than Northrop Grumman, even though the solicitation expressly requested offerors to satisfy as many of these technical "requirements" as possible. 2. The USAF said "no points for extra credit" then awarded extra credit points to Northrop. The Air Force's use as a key discriminator that Northrop Grumman proposed to exceed a key performance parameter objective relating to aerial refueling to a greater degree than Boeing violated the solicitation's evaluation provision that "no consideration will be provided for exceeding [key performance parameter] objectives." 3. Northrop Grumman didn't adequately show that they could refuel all the Air Force's fixed wing aircraft. The protest record did not demonstrate the reasonableness of the Air Force's determination that Northrop Grumman's proposed aerial refueling tanker could refuel all current Air Force fixed-wing tanker-compatible receiver aircraft in accordance with current Air Force procedures, as required by the solicitation. 4. The USAF told Boeing they met a key requirement, but later decided they hadn't fully met it and didn't tell them while still talking to Northrop about it. The Air Force conducted misleading and unequal discussions with Boeing, by informing Boeing that it had fully satisfied a key performance parameter objective relating to operational utility, but later determined that Boeing had only partially met this objective, without advising Boeing of this change in the agency's assessment and while continuing to conduct discussions with Northrop Grumman relating to its satisfaction of the same key performance parameter objective. 5. The USAF interpreted Northrop's refusal to meet a specific maintenance requirement as an "administrative oversight" when it may not have been. The Air Force unreasonably determined that Northrop Grumman's refusal to agree to a specific solicitation requirement that it plan and support the agency to achieve initial organic depot-level maintenance within 2 years after delivery of the first full-rate production aircraft was an "administrative oversight," and improperly made award, despite this clear exception to a material solicitation requirement. 6. The USAF made errors in determining how much the tankers would cost over their life and later admitted that the correct formula had given the advantage to Boeing. The Air Force's evaluation of military construction costs in calculating the offerors' most probable life cycle costs for their proposed aircraft was unreasonable, where the agency during the protest conceded that it made a number of errors in evaluation that, when corrected, result in Boeing displacing Northrop Grumman as the offeror with the lowest most probable life cycle cost; where the evaluation did not account for the offerors' specific proposals; and where the calculation of military construction costs based on a notional (hypothetical) plan was not reasonably supported. 7. The USAF used their own metrics to estimate Boeing's cost and also couldn't prove that their estimates would produce reliable results. The Air Force improperly increased Boeing's estimated non-recurring engineering costs in calculating that firm's most probable life cycle costs to account for risk associated with Boeing's failure to satisfactorily explain the basis for how it priced this cost element, where the agency had not found that the proposed costs for that element were unrealistically low. In addition, the Air Force's use of a simulation model to determine Boeing's probable non-recurring engineering costs was unreasonable, because the Air Force used as data inputs in the model the percentage of cost growth associated with weapons systems at an overall program level and there was no indication that these inputs would be a reliable predictor of anticipated growth in Boeing's non-recurring engineering costs. " http://www.flightglobal.com/blogs/flightblogger/
  4. Gentlemen, I will have the last laugh. It is just a matter of time.
  5. One more time, wacky: There is nothing, absolutely nothing, revolutionary about the A380 other than its size. Nothing. Big it is. Ugly, unfortunately, it is, but revolutionary it is not. And, by the way, each new generation of the B747 it is updated to the latest technology available at the time, including construction materials, avionics, etc. Wings are redesigned, cockpits changed, etc., etc. From the outside it is a classic design, but from the inside out the latest technology is used. Boeing also updates their aircraft throughout its production cycle. One thing is for sure. The B747 is one hell of a lot better looking than the A380. The A380 has to be a French design. Who else could build something so ugly and find it attractive.
  6. Then you should compare the sales of the 777-300ER to the sales of the A380, since, as I said, the 777-300ER, not the A380, is replacing the 747 at most airlines. *** Boeing will continue to rely on 'disciplined approach' to 777 production rates Thursday June 12, 2008 Boeing is coming under, and resisting, intense pressure from airlines to increase production of the 777-300ER, with the first availability for new orders now quoted as 2014. With more and more carriers parking 747s, pressure is mounting for delivery of 777s, which burn 20% less fuel per passenger. In November, VP-Sales-Middle East and Africa Martin Bentrott told the Seattle Post-Intelligencer that production was sold out through 2012 with only a few slots available. In just six months, all of the remaining 2012 and all 2013 slots have been snapped up. Boeing has announced sales of 36 777s this year with a significant number of firm commitments yet to be signed. Responding to ATWOnline, the company said it is "experiencing unprecedented demand for its commercial airliners and is constantly reviewing the complex process of matching demand with the physical and economic constraints of the production system." Currently it is producing 777s at a rate of 6.6 per month based on 33 deliveries through May 30. While pleased with that demand, the manufacturer added, "In the past, Boeing, its employees, suppliers and its customers suffered the effects of a breakdown of the production process resulting from efforts to increase production too rapidly. Boeing is determined to produce efficiently through the market cycles going forward. This will allow us to maintain relatively stable employment levels, maintain high levels of quality and keep the residual values of airplanes high to protect our customers' investment in our products." It continued, "This effort may result in us not being able to meet all customers' requirements in the timeframe they prefer. Ultimately, though, Boeing believes that a disciplined approach to managing production rates is in the best interests of all parties involved." The company did not respond to a question about the effect of the 787 delay--up to 24 months in some cases--on demand for 777s as replacements for shortfalls in capacity. Airlines also are waiting for Boeing's response to the A350-1000, which targets the lower end of the 777-300ER market. It stated that it has been waiting for Airbus to define the exact performance of the A350-1000. Last week Airbus briefed customers in Madrid and advised that the maximum takeoff weight of the -1000 is to climb by 2 tons, which may affect some range performance targets. by Geoffrey Thomas http://atwonline.com/news/story.html?storyID=12988 Power on started Wednesday, 11 June. You will be wrong on this one, and, as I said, the game isn't over on the A380. They have a long way to go to start their Power 8 program, if they ever get it off the ground. Plus, Boeing out sold Airbus for many, many years, before the year 2000 and have out sold them twice since.
  7. The game isn't over CheshirePom. As of the end of May 2008, 25 customers have ordered 352 Boeing 777-300ERs (which first went into service in 2004, but was announced in 2000). Of that 352, 25 have been sold to yet unidentified customers and 51 to leasing companies. The A380 has sold how many in approximately the same period of time? Airbust will never sell enough of the A380s to breakeven. The market just isn't there.
  8. To date there are 5 Boeing 787 in various stages of final assembly. One of the test airframes has already been moved from the assembly line to the testing rig. Parts and sub-assemblies for the next 25 B787s are being built around the world. I just saw a picture of fuselage barrels for planes 13, 14, and 15, line up at the sub-contractor's factory. At this point somewhere between 90 and 100 747-8s have been ordered while the remaining 747-400Fs are being completed. A new 747-400ERF was just delivered a couple of weeks ago. 27 of the ordered 747-8s are for the passenger version. The sad part for you A380, the flying Citron, fans is the A380 will not replace the B747. Since the B777-300ER went into commercial service the airlines that need the capacity and the range having been replacing their 747s with the 777-300ER. It is actually longer than the 747-400 but shorter than the 747-8), has a MTOW 100,000 pounds less than 747-400, carries about the same amount of passengers, carries over 1,000 cubic feet more cargo, has a slightly longer ranges and uses two engines vs four so it saves fuel. Boeing can't build the the 777-300ER fast enougn.
  9. Nope. Wait and watch. There is a very good chance Boeing will be able to catch up and keep the delayed deliveries at a minimum. And for the guy who use to work for Boeing and is carrying that huge chip on his shoulder, the delays have been from the suppliers. Just the other day the company that is building the power supply for the 787 admitted it, but said they are now on track. There is nothing wrong with the technology, it was getting the suppliers up to speed. ******************** 787 supplier Hamilton Sundstrand says power-on 'darn close' Thursday June 5, 2008 Boeing is on track for 787 power-on later this month and the supply chain and technical issues that have caused the program's extensive delays largely are resolved, according to Hamilton Sundstrand, the aircraft's largest systems supplier."Clearly the airplane is making tremendous progress," HS President David Hess told reporters this week at the company's Rockford, Ill., facility, where 787 systems are being built and tested. "It's coming together and we're confident and Boeing's confident that [power-on] will happen this month. The airplane looks pretty darn close to me. . .We've got 100% of the systems they need for power-on to Boeing." HS is providing the electrical, auxiliary power, air-thermal management, hydraulic, fire protection and engine systems for the aircraft. Its 787 work is valued at $15 billion over 20 years. The leap in technology on the 787 posed initial problems as the manufacturer and HS attempted to define system parameters. "It's a revolutionary and very innovative aircraft," Hess explained. "There quite honestly were technical challenges that both we and Boeing didn't fully appreciate. The requirements definition phase took longer than we expected. . .When you go to a composite structure the requirements change and how you develop systems is different." But technical problems were not the major cause of program delays, he said. "We probably had a little bit steeper learning curve on the supply chain side than the technical side," he commented. "We [now] have a lot more rigorous and robust supply chain processes than we had two years ago. . .When you think about where the 787 program has had problems, it hasn't been at the technical level. It's really been supply chain management issues." Those issues stem from Boeing's new global model for building aircraft that empowers suppliers such as HS, which sends 90% of its 787 components to structural suppliers rather than directly to Everett. Boeing has cited poor performance from its suppliers in explaining 787 program delays but recently has insisted that most of the problems have been fixed (ATWOnline, May 20). "I don't want to get into a shooting match with [boeing] on who was late, why it was late," Hess said. "We're all late." by Aaron Karp http://www.atwonline.com/news/story.html?storyID=12932
  10. Found in a bar somewhere:
  11. How about Pattaya Pete's new place? or The Haven on Soi 13? or La Maison on Soi 13?
  12. The bigger the groan, the better the pun! Thanks!
  13. Yep. It has been many years so I don't remember all the specifics, but when microsoft first bought Hotmail they tried running it on their own operating system, probably a version of NT. It crashed repeatedly and the service was up and down like a yo-yo. Finally, to have any credibility, they ran it on FreeBSD and did so for at least a couple of years, if not longer, until they could get greater stability from their own operating system. They don't call it "mickeysoft" for nothing, you know.
  14. Might be a bit of an overdose. Do you know anyone in LOS or know any "veterans" that will be there at the same time? It really helps to have someone there, on the ground, to show you the ropes. Good Luck.
  15. Ah! Thank you for reminding me. The last time I used Hotmail, a long time ago, but after microsoft bought it and changed it, you had to specifically, each and every time you sent e-mail, tell Hotmail to save a copy to your sent box (or out box). There was no provision for doing it automatically. I don't know if that is still the case.
  16. Sorry, I haven't used Hotmail in years. When microsoft bought the company it went downhill and I closed the account. Perhaps someone here is familiar with Hotmail. Good luck.
  17. What e-mail software are you using? Is the delete button close to the send button?
  18. That story is 3 years old this month. "Last Updated: Monday, 9 May, 2005, 16:57 GMT 17:57 UK" http://news.bbc.co.uk/1/hi/business/4528219.stm
  19. Well, as I pointed out over at that "other site" if you buy a ticket on Delta for a trip to BKK you will end up on Korean Air for the longest part of the trip or, perhaps, China Air or EVA Air for the return. Delta has used "codeshare" arrangements for almost all flights to the Orient, since 9/11. The only exception would be if you were to fly out of Delta's hub in Atlanta where they have one flight, but not every day, directly to Seoul (ICN) on one of their own 777-200s. The connecting flight to BKK would be on Korean Air. As they take delivery of more 777-200LRs, 2 out of an order for 8 have been delivered so far, that may change. If the merger with NWA is approved they will, most likely, have more international flights on their own equipment.
  20. In the Philippines it is called, Dinuguan, aka "chocolate meat." Ugh! Can you actually, truthfully call what the British eat, cuisine?
  21. Funny. Thanks.
  22. There have been numerous threads on this subject. You might try using the search function.
  23. Wednesday May 7, 2008 Airbus Dogged By A380 Delays, Factory Sale Trouble May 6, 2008 Airbus suffered a double blow on Tuesday as airlines warned they faced further delays on delivery of the A380 superjumbo and a new hitch developed with the plane maker's cost-saving plans. Dubai airline Emirates, the biggest A380 customer, and Abu Dhabi-based Etihad Airways, both said they had received warnings of delivery delays on the world's largest passenger airliner -- which is already two years behind schedule. Airbus confirmed that chief executive Tom Enders had written to all A380 customers telling them production had reached a critical phase. It announced a "major review" of A380 production last week. Separately, in Toulouse, French unions claimed victory in their battle to stop Airbus from selling some factories -- a plan that is part of a major restructuring and job-cutting exercise. The A380, which went into service last year with Singapore Airlines, is heavily bankrolled by state-owned Emirates, which has ordered 58 A380s. "This will do us serious damage," Emirates President Tim Clark said. Deliveries of the A380 have fallen behind schedule after a series of industrial problems since 2005. The reputation of Airbus parent firm EADS is seen at stake as it strives to deliver 13 planes this year. Emirates, the largest Arab carrier, hopes to receive five A380s before the end of March 2009 and another 12 in the year to March 31, 2010. Clark said he will find out in the next two to three weeks whether that schedule is intact. A spokesman for the Abu Dhabi government-owned carrier, Etihad, said it too had received a letter from Airbus indicating that there may be a delay. Etihad has ordered four of the USD$300 million, 525-seat planes. Europe's biggest single industrial project first faced problems in 2006, when A380 sections reached the French assembly plant with wiring flaws that caused production to halt. Airbus blamed the failure of German and French plants to use the same design software, and was forced to start assembling the first 25 planes by threading the 500 km of wiring through each aircraft manually, pushing deliveries back on average 2 years. In a separate development on Tuesday, unions and industry sources in France said plans to sell two factories to attract investment in new lightweight airframe materials were showing signs of unravelling. The news follows the collapse of talks to sell some factories in Germany. The potential double setbacks highlights the internal and external pressures squeezing Airbus parent EADS as Europe's largest aerospace firm tries to hold together its production system while resisting the global financial crisis. A380 production problems are a legacy of internal rivalries, which until recently prevented French and German factories developing a common system for wiring the double-decker jet, hurting political pride in Europe's biggest industrial project. The factory sales were forced on Airbus by pressure from a relentlessly weak dollar, and have been blown off course by another global financial storm, the meltdown in credit markets, which has made it harder for potential buyers to get hold of funds. Problems with the factory sales have raised questions over the planemaker's next project, the EUR10 billion euro mid-sized A350, as Airbus struggles to crank out the A380. Emirates is also the largest single buyer to date of the A350. Airbus is trying to reconcile the demand for engineers to fix the A380 delays and cope with bulging industry order books with growing pressure to cut costs in the face of a weak dollar. The restructuring plan involves 10,000 job cuts and EUR2.1 billion of savings by 2010, as well as factory sales in France, Germany and Britain. The group is in talks to sell 2 plants to Latecoere, a French supplier of fuselage parts and doors. Key to the success of the plan is the ability to outsource costly A350 research. In March Airbus called off talks to sell three German plants to MT Aerospace, blaming the strong euro. It is also in talks to sell a British plant to GKN. Unions officials who asked not to be identified said EADS had been forced to back further away from the factory talks due to concerns over the availability of funds. Latecoere acknowledged changes in the way Airbus wanted to proceed but denied it had any fund-raising problems. (Reuters) http://news.airwise.com/story/view/1210114297.html
  24. They actually deep fry a Mars bar?! What keeps the thing from melting into sludge? Here, just answered my own question: "A deep-fried Mars Bar is an ordinary Mars Bar fried in a type of batter used in the British Isles for fish, black and white pudding, sausage, and often haggis. The Mars Bar is typically chilled before use to prevent it from melting into the frying fat, though a cold Mars Bar can fracture when heated. The dish was initially served at selected chip shops in Scotland as a novelty item, but was never a mainstream item. Since various mass media have reported on the practice since the mid 1990s, in part as an ironic commentary on urban Scotland's notoriously unhealthy diet,[1] the popularity of the dish has spread." More here, http://en.wikipedia.org/wiki/Deep-fried_Mars_bar
  25. Those photos are very old. I took a tour of The AA hotel 2 years ago and THEN the rooms were so ran down they looked something you might see in a skidrow flophouse. It only can be worst by now.
×
×
  • Create New...