Jump to content
Instructions on joining the Members Only Forum

Samsonite

Participant
  • Posts

    4,270
  • Joined

  • Last visited

  • Days Won

    4

Everything posted by Samsonite

  1. Well, Cheshire Cat, even if it is successful, and they will have to sell another 300 or so to reach the breakeven point, it won't be because of its good looks. It has always reminded me of a 1960's Citroen.
  2. The topic is the B787 and the plane airbust is trying, someday, maybe, if they can get the funding, to build, is more on topic than a "virtual border."
  3. Here we go again, revisions 6 and 7 and 8 and ...... DATE:21/09/07 SOURCE:Flightglobal.com Airbus confirms switch to A380-style nose for A350 XWB By Max Kingsley-Jones Airbus has decided on a raft of revisions to the configuration of its A350 XWB family, including the adoption of a new nose shape and changes to the structural make-up of the fuselage. Proposals revealed by flightglobal.com earlier this year to reprofile and revise the XWB’s nose section have been confirmed by the airframer. The design now incorporates a configuration derived from the A380 with a forward-mounted nosegear bay and new cockpit-window glazing. The unusual four-window arrangement that was a feature of the original XWB design has gone, with a more conventional six-panel flightdeck windscreen similar to its big sister in its place. The cockpit fuselage section will be constructed from aluminium lithium, with Airbus deciding against adopting a one-piece carbonfibre structure that it had been evaluating preiously. A350 XWB chief engineer Gordon McConnell says that the nose reprofile was made partly for improved aerodynamics and also to enable the overhead crew rest to be installed further forward and eliminate any encroachment in the passenger cabin. He adds that strength requirements for birdstrike protection were partly behind the decision to adopt a metallic nose structure. "If we went for a composite structure we'd have to reinforce the area above the cockpit with titanium which is expensive," he says. A key change is the switch from metallic to carbonfibre fuselage frames, although the fuselage crossbeams remain metallic. "These could also be switched to carbonfibre, but we're still running trade-off studies," says McConnell. The plan to use large carbonfibre fuselage panels for the main fuselage skin has not changed. The decision to switch to carbonfibre frames comes after several of Airbus’s key customers, including International Lease Finance and Emirates, had been vocal in their criticism of the XWB’s fuselage construction in recent months. "The change addresses concerns over possible corrosion risks between metallic frames and carbonfibre," says McConnell. He adds that the switch also eliminates some of the "perceived maintentnace programme inspection requirements" that resulted from the use of metallic frames. Airbus remains on target to reach its "freeze of aircraft concept" in October 2008. The first version of the three-model XWB family to enter service will be the 314-seat -900, in mid-2013." http://www.flightglobal.com/articles/2007/...r-a350-xwb.html
  4. September 15, 2007 A350 to have composite fuselage not metal frame Saturday, the Wall Street Journal reported that Airbus has changed the A350 design and will go with a composite fuselage frame. "We thought the design we had was very good, but this one is even better," John Leahy, Airbus chief operating officer for customers, told the paper. Here is part of the Journal story: For months, Airbus had been telling customers that attaching skin panels made of carbon-fiber composites to an aluminum-alloy skeleton was superior to Boeing's method of making both the frame and fuselage of the Dreamliner from composites. But Airbus, a unit of Franco-German European Aeronautic Defence & Space Co., began to rethink its position after encountering resistance from customers who questioned whether the A350 would be more difficult to maintain than the Dreamliner. Airbus has faced public pressure from several key customers throughout the design of the A350. After encountering criticism for first proposing the plane in 2004 with a more traditional all-aluminum fuselage, Airbus said in July 2006 that it was renaming the airplane the A350 XWB, for extra-wide body. Those plans called for making the skeleton of aluminum and the skins of composites, even though some aerospace engineers warned that such a combination could set the stage for corrosion and would require extra attention. John Plueger, president and chief operating officer of leasing titan International Lease Finance Corp., which had criticized Airbus's plans to use the aluminum frame, said he believes Airbus is making the right decision. "This is what we were hoping for," Mr. Plueger said. "We're getting more and more interest in the plane from our leasing customers, so the sooner Airbus can get it to market, the better." There have been a number of heated discussions on this blog about the previous decision by Airbus to have composite panels and a metal frame. http://blog.seattlepi.nwsource.com/aerospace/
  5. Have you ever seen that man drink?! If drinking were an Olympic event, Hammer would be a Gold Medal Winner! He needs and deserves a day of rest.
  6. Emirates' Clark: 787 delay inevitable but insignificant Monday September 10, 2007 "It would have been a miracle for Boeing to have flown the 787 on time," Emirates President Tim Clark said, adding that the delay would not be a factor in the airline's evaluation of the 787 and A350 for an order for 100 aircraft. Talking to ATWOnline onboard the carrier's latest 777-300ER Ultra Long Range, Clark said the 787 will be "one of the finest aircraft ever built," adding, "If you think about it, there is just so much new technology in the 787; it is no surprise at all there is a short delay and the supply chain has let [boeing] down." However, he believes the manufacturer will deliver the airplane close to schedule (ATWOnline, Sept. 6). He also is bullish that the company will get the 747-8I right for the Emirates range specification. "They're not quite there yet but they are much, much closer than they were six months ago," he said. When Boeing stretched the -8I to the same length as the 747-8F, it traded extra capacity for range, which did not suit Emirates' ultra-long-range missions from Dubai (ATWOnline, May 10). The manufacturer has been working on weight reduction in order to operate Dubai-Los Angeles with 400-passenger capability year-round. In the original configuration offered to airlines, the 747-8I had seating for 450 in Boeing's standard three-class configuration with a range of 8,000 nm., later increased to 8,300 nm. after wind tunnel tests. That gain was traded for 17 more passengers in an additional stretch of 2 m. that matched the length of the freighter (ATWOnline, Oct. 31, 2006). Emirates would buy 10-20 such aircraft, but Clark cautioned that internal fit-out configuration issues remain to be sorted out. by Geoffrey Thomas" http://www.atwonline.com/news/story.html?storyID=10156
  7. On the bay side of Walking Street across from the Diamond Arcade.
  8. Boeing, Aeroflot Finalize Order for 22 787 Dreamliners SEATTLE, Sept. 05, 2007 -- Boeing [NYSE: BA] and Aeroflot, Russia's flagship carrier based in Moscow, today announced they have finalized an order for 22 Boeing 787-8s. The order was contingent upon Aeroflot shareholder approval, which was granted yesterday. The order is valued at $3.6 billion at list prices. Aeroflot said the 787 will upgrade its existing widebody fleet, as well as provide for fleet growth to meet increased demand for air travel. "The 787 is an excellent match for many of our requirements thanks to its efficiency, operational performance and passenger comfort. The 787 will open new market opportunities as we further modernize our fleet and expand our international reach," said Valery Okulov, Aeroflot general director. Aeroflot did not announce an engine selection for its 787s. "Throughout the process we worked closely with Aeroflot to understand its requirements and to demonstrate how the 787 meets those requirements," said Craig Jones, vice president of Sales for Russia and Central Asia, Boeing Commercial Airplanes. "The 787 will reinforce Aeroflot's leadership position. It will be a tool for profitability and help Aeroflot offer an all-new passenger experience to its customers." Boeing developed the 787 for the mid-sized jetliner market, estimated at 3,500 aircraft over the next 20 years. Fifty percent of the 787's primary structure is made of advanced carbon composites which allow higher cabin humidity, a lower cabin altitude and the largest windows in the industry. High-efficiency engines combined with a lighter airframe and improved aerodynamics will enable the 787 to produce seat-mile costs normally associated with much larger aircraft. In addition to bringing big-jet ranges to mid-size airplanes, the 787 will provide airlines with unmatched fuel efficiency, resulting in exceptional environmental performance. The airplane will use 20 percent less fuel for comparable missions than any similarly-sized airplane. It will also travel at speeds similar to today's fastest widebodies, Mach 0.85. Also, airlines will enjoy more cargo revenue capacity. Boeing has logged 706 orders from 48 customers for the 787 Dreamliner. ###
  9. Boeing says 787 won't fly before mid-November By Seattle Times staff UPDATE - 08:07 AM Boeing will delay the first flight of its 787 Dreamliner by six weeks or more, executives said on a conference call this morning. The new target date for first flight is "somewhere in the mid-November to mid-December range," said Boeing Commercial Airplanes CEO Scott Carson. He said the delivery date of the first plane remains unchanged. "The plan we are now working still supports first delivery in May 2008." Carson assured analysts that "there will be no impact on our current financial guidance." As recently as July, Boeing CEO Jim McNerney said first flight would occur at the end of September, or a few days into October. Mike Bair, chief of the 787 program, said the changing schedule "adds pressure and some increased risk" to the delivery date for the first plane. He said the company has encountered two problems in completing the first airplane. One is the amount of "traveled work" wiring and systems installation that was not completed on time by Boeing's global suppliers before they shipped major airframe sections to the final assembly plant in Everett. The other snag is the flight control system software, which Bair said "is now slated for completion and delivery later this month to integration labs." Despite the snags, Carson noted that Boeing has logged 258 sales this year, bringing the total to 706 total orders from 48 airlines. Copyright © 2007 The Seattle Times Company http://seattletimes.nwsource.com/html/boei...787delay05.html
  10. I don't claim to be an expert on Mexican food, but I am from an area overran with far more than our share of Mexican restaurants, owned and operated by both established and recent Mexican immigrates. It is easily available, obviously, and reasonably priced, so I eat it quite often. I know good Mexican food when I taste it and what is served at Tequila Reef is not good Mexican food by any stretch of the imagination. I'll go out on a limb here and say that the majority of people I've met who think the food at Tequila Reef is good, are from areas of the world that would indicate they have little to no previous exposure to Mexican food and, therefore, I think it would be fair to say that, perhaps, they wouldn't know the difference between Mexican food and that plastic junk food from Taco Bell.
  11. Good one! Thanks for the laugh.
  12. Korean Air wraps their building in the image of a Boeing 787. "Korean Air’s headquarters will remain “wrapped” in the 787 Dreamliner through the end of the month..... Photo and video courtesy: Korean Air." "Korean Air is a launch customer of the Boeing 787, with 10 Dreamliners on order. Photo courtesy: Korean Air." Story here: http://www.boeingblogs.com/randy/
  13. Just the opposite here. Pattayatalk is just fine. The other boards, especially the one from that place up on Soi 14, are usually so slow I just give up and disconnect. Must have something to do with the location of the server?
  14. If you like lesbians you should like Sisterz. That is a fetish I've never understood.
  15. Try: Mr. Phairoj Munchit, 086-774-5643 Just sent you a PM.
  16. A330s. They don't own any 300s. Some people swear by Northwest and some swear at Northwest. I know a guy who won't fly any other airline, but he also loves the Nana Hotel. That speaks volumes, don't you think? http://ir.nwa.com/phoenix.zhtml?c=111021&p=irol-fleet
  17. The Marriott would be the only one in the class you are looking for in a convenient location, but I believe they are asking more than 3,500 Baht. Who knows, they might have a low season special. Check their web site. I've heard conflicting reports on whether or not it is girlfriend friendly. Some say it isn't, some say it is, and some say there is a joiner fee. You could walk from Walking Street to Soi 6, but it would be long walk. It would be better to take a Baht Bus. You might also want to look at the White House Condotel or the 8th and 9th floor suites at the Sandy Spring. Both are on Soi 13. They both have web sites.
  18. It will be in the former Honey A-Go-Go, on Walking Street across from the Diamond Arcade.
  19. Thank you, Hub. You are very kind. Hub and Bullfrog,I don't see why not. It seems like a very quiet apartment complex. I rarely heard any noise and never saw any of the other guests with their "love of their life du jour."
  20. Someone has asked the question so I thought I would add that the Golden Crab does have remote controlled air conditioning.
  21. The Golden Crab on Soi 13 has remoted controlled air conditioning. http://www.pattayatalk.com/forums/index.php?showtopic=22472
  22. Aerospace Notebook: Boeing may build 16 787s a month By JAMES WALLACE P-I REPORTER THE BOEING CO. is reportedly talking with its suppliers about the feasibility of eventually boosting production rates of its 787 to as many as 16 jets a month. That would be more than double the highest production rate for any previous Boeing or Airbus widebody jet. There have been frequent reports that Boeing is aiming to set 787 rates at 10 to 13 planes a month, but the company apparently is looking at possibly going well beyond that rate. Douglas Caster, chief executive of Ultra Electronics, a British company that makes parts for the 787, told Reuters that Boeing is "talking to the supply chain about raising 787 output from 14 to 16 aircraft a month." Boeing has made no secret that it will boost production of its 787 after the first 112 Dreamliners have been built for customers in 2008 and 2009. Boeing will not increase production sooner because it does not want to overtax its supply chain. That's what happened in the late 1990s. Boeing tried to ramp up production too quickly, and assembly lines in Renton and in Everett broke down when suppliers could not keep up and jetliner parts did not arrive on time. The 787 is being readied for its maiden flight at the end of September. Deliveries to airlines are supposed to begin in late May. With nearly 700 orders so far, the 787 is the fastest-selling jet ever developed by Boeing or Airbus. But that has presented a difficult challenge for Boeing -- 787 production positions are essentially sold out through 2013. Boeing must boost production to get more planes to that growing customer base. Although Boeing does not publicly discuss production rates for any of its jets, it has not quibbled with published reports that it could boost production to as many as 13 787s a month sometime after 2009. An executive with Thales, the French company that is supplying parts for the 787, including the in-flight entertainment system, said a week ago that Boeing was looking at 787 production rates of 11 to 13 planes a month. At a media briefing last month before the public unveiling in Everett of the first 787, Mike Bair, vice president of the 787, talked about the ongoing study of 787 production rates. He said Boeing is working closely with its partners. "What we are trying to avoid is making a premature decision on rates that would cause a lot of people to build a lot of facilities they might not need," Bair said. Unlike in previous jetliner programs, Boeing picked key partners to produce most of the 787. Large, partner-manufactured 787 sections are then flown to the Everett plant, where Boeing workers complete final assembly. That new way of building jets will enable Boeing to complete final assembly of a 787 is as few as six days by the 100th plane, according to Bair. The goal is to get that down to only three days in final assembly. That compares with about 14 days in final assembly for the 777." http://seattlepi.nwsource.com/business/325864_air01.html
  23. The AA Hotel is right on the corner of Soi 13 and Beach Road. To say it is ran down is being polite.
  24. I've never had a problem with luggage on China Air (Taiwan), check through or carry-on. EVA, on the other hand, has weighed my carry-on on two occasions.
×
×
  • Create New...