Drain-laying on Beach Road


Recommended Posts

I hope they do it better this time that they did last time because my memory of it was that it lasted for about a fortnight and then everything they had done was washed onto the beach

Link to post
Share on other sites
  • Replies 78
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

Update on the Beach Rd drainage project. Concrete drain forms in place and ready for use on the north end. Breaking up the existing pavement is now up to Soi 2. And digging commences a

The south end of Beach Road, from Baywalk to Walking street, is a mess at the moment. It appears that the road is being dug up to instal drains. However, if yo

Beach Rd photo update, starting from the north end. Never noticed any customers before today at the Thai Airways office. Line out the door keeping a proper social distance, probably looking to

Posted Images

New electric control box is now installed.
50496881807_74699dd280_h.jpg

The King's sign is getting much needed maintenance work.
50496728721_a80acb27b1_h.jpg

And to paraphrase an old saying, a wet and dreary day in Pattaya sure beats a good day in the office
50496018598_c1f968358d_h.jpg

  • Like 1
  • Upvote 1
Link to post
Share on other sites
  • 2 weeks later...

From the sound of last night's rain I though the beach would have been eroded as bad as after last Tuesday's storm. I was surprised to see that wasn't the case. Makes me wonder now if last Tuesday no one was around to turn the pumps on.

Only erosion I saw was at the north end.
PA300001.jpg

Soi 2 had only a bit of standing water
PA300005.jpg

Soi 6, no damage
PA300008.jpg

Same at Pattaya Klang
PA300010.jpg

  • Like 1
Link to post
Share on other sites
  • 2 weeks later...

Beach erosion update after the high northerly winds this week. Most of the beach looks fine with only moderate erosion on about 700m of the south end.
DSC_0001.jpg

DSC_0011.jpg

DSC_0021.jpg

DSC_0025.jpg

DSC_0027.jpg

DSC_0029.jpg

DSC_0036.jpg

DSC_0042.jpg

DSC_0049.jpg

They've given up on using the debris strainers.
PB130016.jpg

Sluice gate repairs look like they're holding ok for now.
PB130019.jpg

  • Like 1
  • Upvote 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    No registered users viewing this page.


×
×
  • Create New...