Jump to content
Instructions on joining the Members Only Forum

Samsonite

Participant
  • Posts

    4,270
  • Joined

  • Last visited

  • Days Won

    4

Everything posted by Samsonite

  1. I've stopped using EVA about 3 years ago, so I don't know if they have refublished any of their 747-400 or not, but I doubt it. It seems that once an aircraft is assigned to a particular route it stays on that route except when it is down for maintenance. Across the pond for 12-14 hours in one direction and then turned around and sent back to its point of origin day after day. EVA apparently plans to replace most, if not all, of their Boeing 747-400 passenger planes with Boeing 777-300ERs and 777-200LRs. They are a launch customer for the B777-300ER and -200LR and have ordered a total of 15. It would appear their order breaks down as 12 B777-300ERs and 3 B777-200LRs. At present EVA owns 6 B747-400, 9 B747-400 Combi, 3 B747-400F, 14 MD-11F and 11 A330-200. I have yet to see what they will do with their older 747-400s. Sell them, convert them to freighers, who knows?
  2. What did you do with the other 5 hours?
  3. Does anything have to be done to existing SIM cards?
  4. As it has been said in the past, the interior of the aircraft depends on the airline. I've been on 747-400s that have been completely refurbished with new interiors and have all the latest electronics, and I've been on older 747-400 that have not. It all depends on the airline and what they want to offer their customers.
  5. I am a big fan of the Boeing 747-400, but two of the most comfortable transpacific flights I've experienced were on a Boeing 777-200. You might find the following to be of interest: Boeing 747-400: Wing span, 211' 5". Overall Length, 231' 10". Cabin Width, 20'. Boeing 777-300ER, of which EVA has just taken delivery of the 3rd of 15 they have ordered: Wing span, 212' 7". Overall Length, 242' 4" Cabin Width, 19' 3".
  6. As far as I can tell that is not the case. As per the first link noted in my first message above, the generic drugs cannot be marketed until the patent has expired. I suggest you read the material at, http://dsp-psd.pwgsc.gc.ca/Collection-R/Lo.../MR/mr144-e.htm Where you will find, as I printed in my first post, this sentence: "In most countries, including the United States, the basic patent term is 20 years from the date on which a patent application is filed." And here: http://www.ftc.gov/opa/2006/07/genericdrug.htm If anything it would appear that the major drug companies are using every means available to delay the sale of generic forms of their products. As we know many countries, especially in Asia, pay no attention to patents or copyrights. Ten years ago it was reported that 90% of the factories in China that manufacture illegal copies of everything from computer software to watches were owned by the Chinese government. That hasn't appeared to have changed. As most, if not all, of the generic ED drugs are coming out of India, I guess that says something about their government's policies in this regard.
  7. The term of a patent in the U.S. has recently been changed from 17 years to 20 years. Either way that would mean that any generic versions of Viagra or Cialis are in violation of these patents. "In most countries, including the United States, the basic patent term is 20 years from the date on which a patent application is filed. Until recently the standard patent term in the U.S. was 17 years from the date of the granting of a patent. The recent change aligns U.S. law with the provisions of the Uruguay Round Agreements under the General Agreement of Tariffs and Trade (GATT)." See this link: http://dsp-psd.pwgsc.gc.ca/Collection-R/Lo.../MR/mr144-e.htm
  8. They are very girlfriend friendly, but unless there has been a change in policy in the last few months, they do state, in print, in no uncertain terms, that they do not want the business of certain individuals who, one might say, are.... confused about their sexual orientation? The bed is perfectly adequate for 2, but too small for 3, so if you are into all night threesomes it won't be comfortable.
  9. Sorry, I don't have a picture of the pool. I can say that while it is an attractive pool and big enough to swim in, I would not consider it big enough for serious lap swimming. The main pool at the Sabai Lodge on Soi 2 would be perfect for that purpose.
  10. Golden Crab Update: Monthly Rates: 1 bedroom B20,000 p.m. low season, B23,000 p.m. high season. 2 bedroom B26,000 p.m. low season, B29,000 p.m. high season Comfort: They can substitute easy chairs from the old wing for the ones in the rooms. These have soft cushions on seat and back. Internet: They are installing a dedicated ISDN line for fast access. There will be an additional charge for this.
  11. You can buy region/code free DVD players that will play anything from anywhere. Why bother with anything else.
  12. EVA Air is primarily a shipping, as in freight, company and the Boeing 747s I've personally seen EVA use have all been Combi-s. The 747-400 Combi with cargo of 10,422 cu.ft., seats 266 in the standard 3 class configuration (vs. 410 without the cargo). The Boeing 777-300ER seats 365 in the standard 3 class configuration and still can carry 7080 cu.ft. of cargo. Sounds like more seats will be available on EVA.
  13. China Air, the national airline of Taiwan, and EVA Air, also from Taiwan, are two different airlines. China Air should not be confused with Air China from mainland China.
  14. Look here: http://www.pattayatalk.com/forums/index.php?showtopic=22428 and here: http://www.pattayatalk.com/forums/index.php?showtopic=21684 and here: http://www.pattayatalk.com/forums/index.php?showtopic=21517
  15. Bullfeathers. Smoke and mirrors. Boeing has never gone to the U.S. Government and said, "We need XX Billion Dollars to design and build a new commercial airliner."
  16. Funny! You haven't been reading the newspapers for the last month have you?
  17. Yes, Boeing started minor assembly of a section of the 787 two weeks ago and the major assemby and first flight will be in 2007 with the first delivery in 2008.
  18. Instead of coming out fighting with a good offense Airbus offered not much more than a promise. A new plane with a wider body in 3 versions. No specifics. Just a promise. And contruction won't even be approved until October.....let me look at my calendar...Gee this is July....right??? Throw in their reputation for not being able to deliver on time or to meet specs and this is really going to be exciting. By the time they get into actual production the Boeing 787 will be airborne and delivered to the first customers. It will, for whatever reasons, be 6 years before you see this plane in the sky and that leaves a product gap so wide that a fleet of A380s could fly through it and you know Boeing isn't going to let This opportunity fly by. That brings up a question. WHY? Why, with computer aided design and computer aided machinery, does it take so long to build a new airliner? The original 747 went from paper to roll out (plane rolled out of the hanger for people to see) in 16 or 18 months.
  19. There are two web sites: http://www.queenvictoria-inn.com/ and http://www.queenvicpattaya.com/ at either one click on "rooms" and scroll down the page and you will find the room rates.
  20. Do you ever wonder if a little money changes hands on these "awards"? If Singapore Air isn't in the top 5, if not number 1, there is something seriously wrong with the process.
  21. It is 6 months with some airlines.
  22. The new wing of The Golden Crab on Soi 13, has both.
  23. Sorry, what I meant is he would board with the tourist class passengers at Heathrow and board with the business class passengers at AMS.
  24. I was just re-reading your message. At Heathrow you check in with economy/tourist class passengers. At AMS you check in with Business Class passengers.
×
×
  • Create New...