I walked around that headland last month. Not straightforward, but not overly difficult. There's an old lady just around the corner who appears to be living there as well!!

Several massage 'beds' just off the beach line - charging 300 baht an hour!! No privacy curtains and definitely no 'happy ending'!!

 

KM

Link to post
Share on other sites
  • 5 weeks later...

We had our first significant rainfall this afternoon since the completion of the beach nourishment project. Got out and snapped a few pics after the rain let up as I was curious to see how the beach weathered the storm. Verdict is, not very well.

Starting at the north end.
46796729744_afdda63e7c_b.jpg

Beach vendors were busy cleaning up the footpath as soon as the rain stopped.
46796730084_a1285bfefa_b.jpg

46796730224_670e07d669_b.jpg
33643607818_315169ce64_b.jpg 

As expected, the drain channels they installed were completely ineffective.
46796730504_5fc294b0ec_b.jpg

Probably not the best day to be working on the electric control panel.
33643608118_5d3ecd53ac_b.jpg 
46796730734_25b747d0ab_b.jpg
47467782252_c09f8770e6_b.jpg
46796730954_4e7ac6aedd_b.jpg

Stage and seating at the Klang intersection.
46796731144_4c93a3ba51_b.jpg

Bit pissed off they completely blocked the footpath all the way to the edge of the road.
33643608958_0327f38f1f_b.jpg 

Another great Thai idea. Put up a shrine that completely blocks the rain runoff channel.
46796731484_896ecf0837_b.jpg

The Hilton waterfall is back, although much smaller than the 2013 version.
46796731754_61da744609_b.jpg

33643609658_b5f4c5d37e_b.jpg 
46796731974_eab93f3a2d_b.jpg
33643609908_a012cceefb_b.jpg 

The volume of water in this pic is about the limit of what the rain channels can handle.
46796732204_3a54d1ff3a_b.jpg

Less than a month since construction, and with the first storm cracks are already appearing.
40554516623_8cb8be2b1a_b.jpg

I give it one or two more storms before the whole concrete pad is undercut and washed out. This is the runoff pad across from Soi 13/1.
46796732474_596b030fe7_b.jpg
40554516743_dd1a78779a_b.jpg

I see the short sections of concrete walls are doing their job to help keep the palm trees from getting washed out to sea.
40554517013_7efc09442c_b.jpg
40554517273_02f811c357_b.jpg
40554517473_7fb0290aa6_b.jpg

Disgusting mess on the south end.
40554517523_cd2fd3da8d_b.jpg

40554517583_74acf61827_b.jpg

I wonder if these large flapper valves are still operational.
40554517643_c69154bed6_b.jpg

At least the pumps are working.
40554517763_704fc6f4e7_b.jpg

Southend has the makings of a new Hilton waterfall.
46796729154_d1f3d27953_b.jpg

 

Edited by forcebwithu
changed pic embed code, removed dupl pic
  • Thanks 3
  • Upvote 1
Link to post
Share on other sites

Should be interesting to see how much

is left bye May 24 fireworks. Had really hoped to get

picture north of beach from PBG  ?. Thai engineering

at it finest. pump water has that lovely shade of brown.

Link to post
Share on other sites
12 hours ago, Bazle said:

Thanks, FBWY. 

Very predictable, but also very sad. 

Sad indeed, my very thoughts. So much time and effort and  money. Also what was superficially a good result, but the usual underlying poor design and quality fails. We are having some early rains this year and heavy at that,  it does not bode well for Pattaya Beach. 

Link to post
Share on other sites

Some snaps from this afternoon on the progress of the repairs.

North end, doesn't look like they've done anything.
47481409972_bb7e2ffce8_b.jpg

Across from Soi 3, repairs done. Have to say, the footpath has held up well so far.
40568139063_997e205403_b.jpg

Soi 6 pumps are back, only two days late.
47481409712_30717f30f7_b.jpg

Soi 6, repairs underway.
40568139953_8cb5f8924b_b.jpg
32591730957_3c9ab02b51_b.jpg 

Big pow wow underway too. Wonder what creative BS they'll come up with to explain why part of their multi-million baht project got washed away with the first significant rainfall.
40568139783_e8fb58674b_b.jpg

Across from Soi 12, concrete pad is in worse shape than what I noticed two days ago across from Soi 13/1.
40568139623_7acebd815f_b.jpg
46618689725_76d68e6d9d_b.jpg
40568139433_0fc85b2c00_b.jpg

Across from Soi 13/1, shadow is hiding it, but there is separation the length of the retaining wall seaside.
47481410122_a5b42bab30_b.jpg

As well as on the footpath side.
40568139263_934ddba640_b.jpg

  • Thanks 2
Link to post
Share on other sites
  • 2 weeks later...
  • 1 month later...

Beach Rd palm trees are getting wrapped in decorative LED strip lighting.
P5230003.jpg
P5230006.jpg

Excavators onsite repairing damage from Wednesday morning's storm.
P5230010.jpg

They better not go too far as the next storm is on the horizon.
P5230013.jpg

  • Like 1
Link to post
Share on other sites
  • 3 weeks later...

Do you think anyone in Pattaya has consulted a civil engineer , you know someone who can predict the actions of the seas when the headland is changed . Looking at what is happening when the flooding comes its pretty clear no one has or they didn't listen .

 

 I would say they need to build a reef a couple of hundred feet out from the beach to stop the tides undermining all the work they are trying to do and a couple of Irish foremen to make sure the work is actually carried out to a decent standard , which from the pictures is not the case.

 10 for effort 1 for what actually got done.

 

Edited by sinbinjack
Link to post
Share on other sites
  • 2 weeks later...
  • 2 months later...
2 hours ago, frankie8 said:

Shit, you guys must be bored out of your mind! ?

Hardly.... you jumped in on an old thread!

  • Haha 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    No registered users viewing this page.

×
×
  • Create New...