Recommended Posts

Posted

The rate of progress doesn't seem to have sped up. Shame, as it's a great opportunity to do so in the current environment.

  • 2 weeks later...
  • 2 weeks later...
Posted
16 hours ago, forcebwithu said:

Won't be long now before the north end of Beach Rd is concreted over, and hopefully the last bits of drains connected.

I guess this was before the rain yesterday?

Had a horrendous amount where I live North of town, likely 5cm+.If they received similar out by the lake there should be substantial improvement. 

Posted
5 hours ago, jacko said:

I guess this was before the rain yesterday?

Had a horrendous amount where I live North of town, likely 5cm+.If they received similar out by the lake there should be substantial improvement. 

Recent rains have had no positive effect on the reservoir level. It'll take at least a day of heavy, constant monsoon rains to begin to refill the reservoir.

 

  • Like 1
Posted

North end of Beach Rd was blocked for a short time this morning while they did a bit of tree trimming.
49858100671_98805cdfbe_b.jpg

49858100591_6854ec5999_b.jpg

Putting in rebar for the final section of storm drain.
49858407117_b88607228a_b.jpg

49857560893_6c0e54c869_b.jpg

Drain pipe is now more than half full of sand.
49858100446_43b8e6c3b5_b.jpg

Making the beach look nice for all the tourists in town.
49857560733_fbfaaeb12f_b.jpg

49857561963_5c611328f4_b.jpg

49858408217_b6ea6450ef_b.jpg

Cleaning out the sand from the Soi 6 catch basin.
49858101266_472799d3c0_b.jpg

49857561808_9245a67902_b.jpg

Honest, I only stopped here to take a pic of the footpath repairs.
49858407992_c9472ed8dd_b.jpg

I had speculated they would pour a single concrete cap that would cover the entire catch basin. Looks like I was wrong and they're doing it in two sections.
49857561648_1d0c1d0d7a_b.jpg

49858407792_fe3929e9e8_b.jpg

49857561448_2e6081b7c2_b.jpg

49857561348_005c3bcb8b_b.jpg

  • Thanks 4
Posted (edited)

Thank you!

 

The perspective in the photo of the man cleaning the drain and the man watching is fascinating....Thanks again!!

Edited by Bullfrog
Posted

Whenever you're looking for a bit of 'normality' in these crazy times, this thread certainly is it lol. How long ago was it meant to be finished.

Amazing Thailand!

Posted
45 minutes ago, Irish boy said:

Whenever you're looking for a bit of 'normality' in these crazy times, this thread certainly is it lol. How long ago was it meant to be finished.

Amazing Thailand!

Think it was supposed to be finished by February 13th, what year jokes aside. I can understand the delay though with the amount of tourists and traffic in Pattaya now. Hard to finish a roadworks project in this environment, at least for the Thais. :whistling:

  • Haha 1
Posted
35 minutes ago, forcebwithu said:

Think it was supposed to be finished by February 13th, what year jokes aside. I can understand the delay though with the amount of tourists and traffic in Pattaya now. Hard to finish a roadworks project in this environment, at least for the Thais. :whistling:

Yes, when you need a 'reality check' for Thailand in these crazy times, these 'works' are it lol

Posted
On 8/20/2019 at 12:18 PM, Big_Brian said:

It'll be a nuisance, but we can't say it doesn't need doing.  Just ban the coaches and one lane is plenty.  ?

 

Would you please include in that banning the parking of rental bikes for rent.   The don't need to take up 60% of Beach Road.

  • Like 1
  • Upvote 2
Posted
1 hour ago, 9cisco999 said:

 

Would you please include in that banning the parking of rental bikes for rent.   The don't need to take up 60% of Beach Road.

I wish that I could "double green" that comment!!!

Posted

North end terminus of the Beach Rd drain had a small volume of water coming in. Not sure where it was coming from, but what it did highlight is how plugged up the drains currently are. For the small amount of water coming in it should barely cover the bottom of the basin before draining away, not fill the basin 3/4 full of water.
49872903126_142951d22a_b.jpg

49872903801_40267684ab_b.jpg

Next open basin the water was barely moving. I wonder how far down the drain the construction debris extends, and to what depth.
49873215002_daf40374b9_b.jpg

49872371843_e9fefbdb1a_b.jpg

49872903591_870d99d1b3_b.jpg

49872903536_535c080502_b.jpg

49873214752_3b44949748_b.jpg

49872371363_eecc814c55_b.jpg

Not sure what they're working on down in the hole, but whatever they're doing they've been busy it at for a few days now.
49873214677_bc7e243645_b.jpg

  • Like 1
  • Upvote 1
Posted

Excellent.

The trees are looking bushier aswell.

I'd like to think that one day the wooden benches around the trees will return..If not, at least the return of the small wall running the length of Beach road...

Posted

sometime i forget how detail you have to be here.

install drain line beach road (nothing in contract about working or clean)

now the walk way same contract replace stones (nothing about color codes)?

Posted (edited)
1 hour ago, aj said:

sometime i forget how detail you have to be here.

install drain line beach road (nothing in contract about working or clean)

now the walk way same contract replace stones (nothing about color codes)?

Oh YES you have to be very specific in contract negotiations and RFQs in Asia and Africa..I've been through quite a few... but the worst country I have worked in (and quit) was USA. 

How to walk

"Whilst working on any of our sites, or any other site, any where on this planet, or one that we may inhabit in the future, you must walk one step at a time (Only for functional biped humanoids - for  all other non discriminatory alternatives please read addendums to the contract). After each step it is your contractual responsibility to observe a 360 deg area that all contractual Health and Safety regulations (not limited to this planet but includes all planets or interspacial working platforms) are being adhered to.  When all observations have been confirmed by a group of independant advisors that equal opportunities groups have agreed that the movement of the travelling leg ( See contractual definitions) whilst not being the standing leg but has intentions of being the standing leg does not infer any superiority, nor gain superiority once it becomes the standing leg."

Edited by Bullfrog
Posted

Update on the Beach Rd drainage project from this morning.
49892570393_05ed4663a5_b.jpg

Still working on the "drainage" part of the project.
49892570378_e8fd0750b6_b.jpg

49893086226_852fff66d0_b.jpg

49893395492_a76ab6059c_b.jpg

49893085726_f535c808e5_b.jpg

49892570183_68c76f456d_b.jpg

49893086006_8fda3bfb23_b.jpg

49893395322_ef67ae7c59_b.jpg

49893085946_efefb75c39_b.jpg

Think this is a power washer rig for cleaning the smaller drains.
49893395142_05d26a8fa7_b.jpg

49892569983_62a96dc802_b.jpg

49893085751_a9509a5616_b.jpg

49893395102_d8d0d679f6_b.jpg

49892569898_422e14f82e_b.jpg

A couple of side projects going on
49892570273_f559ebf601_b.jpg

49892570243_03f515bcc3_b.jpg

49893395387_c795dba9d4_b.jpg

49893395252_9717f88bdd_b.jpg

49893395217_999406700a_b.jpg

  • Upvote 3
Posted

The drain project is almost finished at the north end.
49912062207_797107183b_b.jpg

49911249383_42d11b0642_b.jpg

49911249528_f3ebc8aa98_b.jpg

Standing water at the Soi 6 junction.
49911249548_a31bb236ab_b.jpg

49911766246_647d7a62ec_b.jpg

Bad doggy
49911766231_b2f4eb22d0_b.jpg

South end still has a lot of form work going on.
49911249483_c5a2ce721b_b.jpg

49911249463_88761a826a_b.jpg

49912062357_99655f6a50_b.jpg

49912062302_8992c95d03_b.jpg

The rebar goes quite high. Maybe housing for permanent pumps?
49911249398_d88a921dfe_b.jpg

  • Thanks 1
Posted

I really am pleasantly surprised!

We had a total shitfest with flooding after Sunday's downpour...We even had some during the night...but it doesn't seem that adversely effected...

Posted

Noticed on another board a pic of the curb laying where it looked like they had stopped using concrete for the bed and were placing the blocks directly on the sand. My curiosity piqued I went out this morning to snap a few pics of the current work. Turns out they still are putting a layer of concrete down first. But now the question is, is concrete like hair gel, a little dab'll do ya.
49915341862_8a866b5577_b.jpg

49915043026_bacbb05c8b_b.jpg

49915341932_c4bd2eba52_b.jpg

Posted
3 hours ago, forcebwithu said:

Turns out they still are putting a layer of concrete down first. But now the question is, is concrete like hair gel, a little dab'll do ya.

A blinding layer maybe ..???

  • Upvote 1
Posted

When i left to do taxes in Feb. They had announced that the money and plans to lay pipe 

all the way to Bali Hia Pier. Beach side of walking street. Is that still on?

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...