Update on the Beach Rd drainage project. Concrete drain forms in place and ready for use on the north end. Breaking up the existing pavement is now up to Soi 2. And digging commences a

The south end of Beach Road, from Baywalk to Walking street, is a mess at the moment. It appears that the road is being dug up to instal drains. However, if yo

Beach Rd photo update, starting from the north end. Never noticed any customers before today at the Thai Airways office. Line out the door keeping a proper social distance, probably looking to

Posted Images

and yet the cynic in me says that nothing will change!! 

Link to post
Share on other sites
4 hours ago, Big_Brian said:

It'll be a nuisance, but we can't say it doesn't need doing.  Just ban the coaches and one lane is plenty.  ?

We can certainly say it needs doing PROPERLY!

I've already read that a falang engineer believes that the diameter of the pipes they are laying is inadequate. 

Link to post
Share on other sites
6 minutes ago, Bazle said:

We can certainly say it needs doing PROPERLY!

I've already read that a falang engineer believes that the diameter of the pipes they are laying is inadequate. 

Doubt anywhere could have large enough drainage pipes to handle the tropical downpours. Best they can plan for is diverting the water into canals and out to sea to avoid flooding in other parts of the city.

Link to post
Share on other sites
  • 5 months later...

Thanks for the update and the pics. Looking at all the exposed rebar sends shudders down my spine. Any poor sod who slips and falls onto that is in some serious trouble, or worse still, a motorbike hitting it, it's a modern day equivalent of a punji pit.

Link to post
Share on other sites
7 hours ago, Butch said:

Thanks for the update and the pics. Looking at all the exposed rebar sends shudders down my spine. Any poor sod who slips and falls onto that is in some serious trouble, or worse still, a motorbike hitting it, it's a modern day equivalent of a punji pit.

Almost did just that setting up to take this pic. The sand underfoot started to give way. Fortunately most of my weight was still on the other foot so easily jumped back. It did give me pause when I considered just how bad it would have been if I tumbled the other way. That would have been no ones fault but my own for standing so close to a construction site. :doh:

49551546957_6287989656_b.jpg

  • Like 1
Link to post
Share on other sites
  • 2 weeks later...

So they have started digging at the Amari which is pretty much the end of Beach Rd, but I get the impression the other end of the snake is still way back up by Pattayalands or even the sewage pumping into the sea plant? I have avoided the Beach Rd for so long now!

  • Like 1
Link to post
Share on other sites
57 minutes ago, jacko said:

So they have started digging at the Amari which is pretty much the end of Beach Rd, but I get the impression the other end of the snake is still way back up by Pattayalands or even the sewage pumping into the sea plant? I have avoided the Beach Rd for so long now!

You do at times turn a great phrase!

 

Link to post
Share on other sites
On 3/4/2020 at 1:48 PM, forcebwithu said:

They're now up to across from the Amari hotel breaking up the road surface for the Beach Rd drainage project.
49616788871_d54c3c8671_b.jpg

Soi 1 they've started digging.
49616788856_f7c4011a1f_b.jpg

They're setting up the Soi 6 pumps again, probably not for any expected rain, but to help drain the water that has been collecting in the drains under construction.
49616788826_b7c82f4eff_b.jpg

South end of Beach Rd. now getting backfilled.
49617045682_aa60191890_b.jpg

49616272473_df78e82452_b.jpg

A few more pics of the beach. South end has new shelters for the homeless.
49617045607_6d43815ea7_b.jpg

49616788676_d4f914ba2c_b.jpg

49616272358_a08020aac9_b.jpg

11:30 am and only one parasail up
49616788636_d62dfc6b0b_b.jpg

Just walked down beach road from Soi6 to mike's, the pumps are primed and ready to go and fenced off,still the one solitary parachute and only saw one guy working grinding the rough edges or cutting a straight edge.mikes shopping centre is dead,not much happening in terminal 21 but I was there just after it opened it's handy for me to get some of my daily 10k walk round the floors in reasonable cool conditions.Around soi Buakhao and metro it looks normal and busy but it's not it must be scary if you are working, it's starting to look disastrous for the little people in Pattaya.

Link to post
Share on other sites
  • 2 weeks later...

As I said before, that rebar gives me the shits big time.

I think it is because when I was at primary school we had to watch these "gore fest" "educational govt safety videos - building sites bite" has a lot to answer for!

Link to post
Share on other sites
1 hour ago, Butch said:

As I said before, that rebar gives me the shits big time.

I think it is because when I was at primary school we had to watch these "gore fest" "educational govt safety videos - building sites bite" has a lot to answer for!

On my next photo recon I'll try and get more rebar porn shots for you. :D

  • Haha 1
Link to post
Share on other sites

 

Even with the major construction on Beach road, the  traffic flow seems to be relatively OK.       I   really don't think the  journey from Soi 6 to Walking Street is any longer than usual.

Link to post
Share on other sites
52 minutes ago, 9cisco999 said:

 

Even with the major construction on Beach road, the  traffic flow seems to be relatively OK.       I   really don't think the  journey from Soi 6 to Walking Street is any longer than usual.

Only because there has been a lot less traffic than normal over the last couple of months.?

Link to post
Share on other sites
3 hours ago, 9cisco999 said:

 

Even with the major construction on Beach road, the  traffic flow seems to be relatively OK.       I   really don't think the  journey from Soi 6 to Walking Street is any longer than usual.

Well I just drove South from the Amari... traffic moving OK... but only because there hardly is any. It was different 2 weeks ago.

Link to post
Share on other sites

It doesn't matter where you drive at the moment the traffic is very light.  Previously when you tried to cross 2nd Road from VT6 to MIT it could take a fair bit of time with the traffic backed up - Now at 9:00pm you can stroll across with big gaps in the passing traffic.  Also a piece of piss to get across to MIT on the scooter. 

Link to post
Share on other sites
On 3/20/2020 at 11:35 AM, tallguy said:

Only because there has been a lot less traffic than normal over the last couple of months.?

 

On 3/20/2020 at 1:44 PM, jacko said:

Well I just drove South from the Amari... traffic moving OK... but only because there hardly is any. It was different 2 weeks ago.

 

Maybe my memory isn't serving me well but I think this project has been ongoing for nearly a year in one shape or another.      All in all I'm surprised how smoothly the traffic moves during the construction.     I'm happy about that as Pattaya isn't  a great place for short cuts or detours.

Thanks to forcebwithu for a very good photo spread.

Edited by 9cisco999
Link to post
Share on other sites

My recollection was that the traffic on Beach Road was moving even slower than normal prior to the turn of the year. The absence of the tour coaches, and lots of other visitors, means traffic now flows fairly freely despite the roadworks.

 

Edited by tallguy
Link to post
Share on other sites

Update of the north end of Beach Rd as of this morning. Looks like they might be fast tracking the project now that there's very few tourists left.

49699703366_044065cb76_b.jpg

Soi 1
49699172713_682c8ae227_b.jpg

Soi 2
49700014917_840d56a7fc_b.jpg

49699703271_10fa75db06_b.jpg

Soi 3
49699172618_658535c964_b.jpg

49700014827_cb83f17f51_b.jpg

Soi 5
49700014797_757789be85_b.jpg

And at Soi 6 it looks like they either dug out the buried pipe that connects the south end of the drains, or they installed the missing section in the past week. At any rate, the water from the north now has a way to continue on to the south.
49699172483_d7b2385736_b.jpg

  • Thanks 1
  • Upvote 3
Link to post
Share on other sites
16 hours ago, forcebwithu said:

And at Soi 6 it looks like they either dug out the buried pipe that connects the south end of the drains, or they installed the missing section in the past week. At any rate, the water from the north now has a way to continue on to the south.

Kinda wonder whether a lot of drainage and sewage lines that used to come down the Beach Rd sois from soi Pattayaland 2 (13/4) to Soi 1 are still connected to something, and where do they go?

Link to post
Share on other sites
5 hours ago, jacko said:

Kinda wonder whether a lot of drainage and sewage lines that used to come down the Beach Rd sois from soi Pattayaland 2 (13/4) to Soi 1 are still connected to something, and where do they go?

In my latest pic of the Soi 6 drain, you can see to the left of the black, plastic drain the concrete drain that I'm pretty sure ties into the laterals coming in from the different sois along Beach Rd. I believe the new drains are meant to supplement the existing storm water drainage, and all lead to the pumping station at the south end of Beach Rd.

49699172483_d7b2385736_b.jpg

  • Thanks 1
Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Recently Browsing   0 members

    No registered users viewing this page.


×
×
  • Create New...